projects

Renovation of Hotel El-Aurassi

2009
Algeria
Algeria
  • total area: 66.000 m2
  • description of works: Renovation Works
  • project location: Algeria City
  • client: EGHEA
  • project duration: 24 months
  • start date: 01.01.2009
  • hand-over date: 01.01.2011