- total area: 37.674 m2
- description of works: Engineering and Turn-Key Construction
- project location: Kaliningrad Str., Crossroad Shevchenko Str. and Lenin Ave
- client: TUTA STROY Co.
- project duration: 18 months
- start date: 01.04.2006
- hand-over date: 01.10.2007
